Make sure the following arrangements are ready before the service engineer's visit.
Before the service engineer arrives for installation, ensure the raw materials are ready according to the die size.
For hydraulic paper plate machines, arrange Hydraulic Oil 68 grade (minimum 35 liters) in advance.
Before installation, ensure proper power supply arrangements including a sealed meter board and MCB connection
(32A MCB, 3-core wire).
Additionally, install a 3-pin switch board (16A, 3-pin) near the machine along with proper earthing.